On a long carrier with an in-line booster, a trip at one station is a surge event at both. We modelled station 1 pumping 8 km into the suction of an in-line booster that lifts the flow another 10 km to a reservoir. If the booster trips alone, station 1 keeps pushing and the suction main rises to 76 m. If station 1 trips and the booster runs on, the booster empties its own suction main and the pressure there reaches vapour in 9 s. If both trip, both mains separate. A break tank at the booster decouples the two mains, and then each main needs only its own protection: 4.2 m³ of gas at station 1 and 2.8 m³ at the booster keep both lines at or above +3 m in every trip. This article works through the scenarios, the interlocks and the choice between in-line boosting and a break tank.

1 · The system

The carrier is DN800 ductile iron with the friction gradient of the series' reference main, 0.70 m³/s and a wave speed of 1,050 m/s [1]:

The model is a method-of-characteristics network solver with a vapour cavity model, verified against the series solver to 0.01 m; the pumps run down on their inertia with the constant-efficiency torque law [2][3]. The profile is flat, so heads are pressure heads.

2 · Three trips, two mains

An in-line booster joins the two mains hydraulically: the flow through main A is the flow through the booster, and so through main B. Any change at either station reaches both mains [4][5].

Trips at two stations in series
Upper: pressure head at the booster suction (end of main A) and discharge (start of main B). Lower: minimum and maximum envelopes along both mains, main A from 0 to 8 km and main B from 8 to 18 km. Network MOC model, vapour cavity model, 100 m reaches, 200 s.
The three events every series system must pass.
The vessels are sized in section 4.
Main A: lowest
–
Main A: highest
–
Main B: lowest
–
Main B: highest
–
Booster suction reaches vapour at
–
Verdict at +3.0 m
–

In-line, the booster trip lifts the suction main to 75.7 m while main B dips to 30.1 m; the station 1 trip takes the booster suction to vapour after 9.0 s; the power failure separates both mains. With a break tank, each main sees only its own station: a station 1 trip affects main A alone (−9.3 m, close to vapour), a booster trip affects main B alone (+11.9 m). With a vessel at each station the worst minimum on either main is +3.2 m, and the vessel's return swing lifts main B to 129.8 m, inside the 136 m limit of this series.

3 · The low-suction interlock

Every in-line booster needs a low-suction trip, to stop it running into vapour when the supply fails. A common instinct is to delay that trip so that a brief dip does not stop the booster. The model shows what the delay does after a station 1 trip [5][6].

Station 1 trips; the booster follows after a delay
In-line arrangement, no protection. Pressure head at the booster suction and discharge for a booster trip delayed after the station 1 trip.
Delay of the low-suction trip.
Suction: lowest
–
Suction at vapour from
–
Discharge: lowest
–
Main B: lowest
–

Whatever the delay, the booster suction separates: run on, the booster drains its suction in 9 s; trip it at once and its own rundown, combined with main A's downsurge, separates the suction after about 18 s. Main B reaches vapour in every case in which the booster stops. The interlock protects the pump from running dry; it does not protect either main. That needs protection on the mains, which is the subject of the next section.

4 · Decouple, then protect each main

Protecting an in-line pair is hard because every device interacts with both stations: a vessel at station 1 cannot stop the booster drawing its suction down, and a suction-side vessel at the booster changes the discharge-side response. Our sizing runs with three vessels on the in-line arrangement (station 1, booster suction, booster discharge) did not find a combination that passed all three trips. A break tank (or a reservoir) at the booster removes the coupling: main A discharges into the tank, and the booster lifts from it [4][7]. Each main is then a single pumped main, sized as in sizing the surge vessel:

Vessels for the decoupled system, sized for the power failure at both stations (+3.0 m everywhere), DN400 differential connections
MainGas at steady flow (m³)Largest gas volume (m³)Shell at 80 % (m³)Lowest (m)Highest (m)
Main A, vessel at station 14.216.521+3.2087.8
Main B, vessel at the booster discharge2.813.317+3.27129.8
Every trip against every arrangement
Lowest pressure head on each main for the three trips and three arrangements, from the same runs as above. Bars below the criterion fail it; bars at −9.8 m are vapour.
Check it against the project's allowable values.
Combinations passing on both mains
–
Worst combination
–

Only the decoupled system with a vessel at each station passes all three trips at +3.0 m. Lower the criterion to −3 m and nothing else changes: every other arrangement still reaches vapour in at least one trip.

The break tank brings its own costs: a structure, its overflow and level control, a second set of pumps drawing from atmospheric pressure, and the loss of the residual head at the booster (33.2 m here), which the booster must then supply. Where the head is too valuable to break, the in-line arrangement must be protected as one system, with suction and discharge devices sized together and checked against all three trips and the interlocks, usually with more conservative devices and faster interlocks.

5 · Points we check on every series system

6 · Setting it up in Bentley HAMMER

Field names differ slightly between versions [8].

  1. Model both stations and both mains in one model, with the booster's pumps, check valves and bypass explicit, and its suction node at the real elevation.
  2. Give each pump its own inertia and specific speed, from data sheets or the correlation.
  3. Create three trip scenarios using the pumps' shutdown settings: station 1 alone, the booster alone, both. Add delayed trips for the interlocks with the real delay times.
  4. Report the booster suction and discharge as report points, and plot the profile envelopes over both mains.
  5. For the decoupled option, model the break tank as a tank at its operating level, and size each main's protection with the other station running and tripped.
  6. Check every combination of the final devices against all trips, and the restart order.

7 · Checklist

Surge analysis practice series
  1. Is your HAMMER run right? Time step, adjustment and run duration
  2. Validating a surge model with a field pump-trip test
  3. Sensitivity and uncertainty: bounding the result
  4. Pump data for a pump trip: inertia, specific speed and four-quadrant curves
  5. Demands, branches and dead ends in a transient model
  6. Reading the surge envelope against the pipe's real limits
  7. Transient forces on pipe supports and bends
  8. Booster stations in series
  9. Pump starts, controlled stops and drive ramps
  10. Filling, draining and restarting a transmission main
  11. Surge in wastewater force mains
  12. The surge study report: what to deliver and what a reviewer checks
The protection devices themselves are covered in the surge protection design series.

References & standards

  1. Abokhatwa, M. Surge protection design series, abokhatwa.com, 2026: the reference main, its friction gradient and the verified MOC solver.
  2. Wylie, E.B. & Streeter, V.L. Fluid Transients in Systems. Prentice Hall, 1993: network characteristics, pumps in series and booster boundary conditions.
  3. Bergant, A., Simpson, A.R. & Tijsseling, A.S. “Water hammer with column separation: a historical review.” Journal of Fluids and Structures, 22(2), 2006: the vapour cavity model.
  4. Thorley, A.R.D. Fluid Transients in Pipeline Systems, 2nd ed. Professional Engineering Publishing, 2004: booster stations, break tanks and the interaction of stations on long pipelines.
  5. Chaudhry, M.H. Applied Hydraulic Transients, 3rd ed. Springer, 2014: pumps in series and the response of multi-station systems.
  6. Boulos, P.F., Karney, B.W., Wood, D.J. & Lingireddy, S. “Hydraulic transient guidelines for protecting water distribution systems.” Journal AWWA, 97(5), 2005: booster pump stations and protection strategies.
  7. Stephenson, D. Pipeline Design for Water Engineers, 3rd ed. Elsevier, 1989: break tanks and the hydraulic separation of pumping stages.
  8. Bentley Systems. OpenFlows HAMMER documentation: pumps, check valves, pump shutdown settings, scenarios and report points.