A transient model is a simplification of the network, and the simplifications are not neutral. On the 12 km reference main with its vessel, an offtake of 0.15 m³/s at 6 km changes the answer depending only on how it is drawn. As a fixed demand the line falls to +2.11 m and fails the +3.0 m criterion; as a pressure-dependent demand it holds +3.82 m; as a branch pipe to a tank, +5.57 m; left out altogether, +4.33 m. Add a closed 1.5 km branch to the main and the line minimum drops to +1.26 m while the dead end goes to vapour. This article shows which network details a surge model must keep, how to model demands, and what can safely be removed.

1 · Why network detail matters in a transient

A steady-state model only needs the network to carry the right flows at the right heads, so it tolerates heavy simplification. A transient model also needs the network to reflect, absorb and store pressure waves correctly [1][2]:

The examples use the series' reference main: 12 km of DN800 ductile iron at a wave speed of 1,050 m/s, 0.70 m³/s entering at the pump, a delivery reservoir at 44.8 m, and the series vessel (3.5 m³ of gas, DN400 differential connection) protecting an instant pump stop [3]. The network solver is the same method-of-characteristics code with a vapour cavity model, verified against the series solver to 0.01 m.

2 · Fixed or pressure-dependent demand

The offtake at 6 km takes 0.15 m³/s, leaving 0.55 m³/s for the second half of the main. Three ways to model it are common [2][4]:

\[ \text{fixed: } q = q_0, \qquad \text{orifice: } q = q_0\sqrt{\frac{p}{p_0}}, \qquad \text{branch: a pipe to a tank, with its own wave speed and friction} \]

A fixed demand is the default in many models, because steady-state demands are usually entered that way. During a downsurge it keeps drawing 0.15 m³/s however low the pressure falls, so the main loses water it would in reality keep. The orifice form, sized to pass \(q_0\) at the steady pressure \(p_0\), draws less as the pressure falls and more when it rises. A real offtake to a tank is a pipe, and the tank supplies water back into the main when the main falls below it.

One network, five ways to draw it
Reference main with its vessel, instant pump stop, 150 s. Minimum and maximum pressure head along the main. The grey lines are the envelope of the case chosen for comparison. Network MOC model, vapour cavity model, 100 m reaches.
Same pipes, same pump, same vessel.
Drawn in grey.
Lowest head on the main
–
Where
–
Highest head
–
Vessel gas, largest
–
Verdict at +3.0 m
–

The three ways of modelling the same offtake give +2.11, +3.82 and +5.57 m: a fail, a narrow pass and a comfortable pass. The fixed demand is the most pessimistic, the branch to a tank the most favourable, because the tank feeds water back into the main at 6 km. The orifice demand also moves the lowest point: from 4.7 km to the pump. Leaving the offtake out (+4.33 m) is not conservative here: it overstates the margin of the fixed-demand case by 2.2 m.

At the offtake
Pressure head at the offtake junction (6 km), or at the closed branch's junction and its dead end (3 km and 1.5 km along the branch), with the demand drawn by the offtake where it is a demand.
Right axis: demand in m³/s.
Junction: lowest
–
Demand: range
–
Dead end: highest / lowest
–

The pressure-dependent demand falls from 0.15 to 0.069 m³/s as the downsurge arrives and rises to 0.18 on the return: it behaves as a small relief at the junction. The closed branch fills and empties with every reflection, and its far end goes to vapour 18 s after the trip, while the main loses 3 m of minimum.

3 · Dead ends and closed valves

A closed branch is the clearest example of a detail that skeletonisation must keep. A wave entering it reflects from the closed end with doubled amplitude and comes back to the main after \(2L_b/a\): 2.9 s for the 1.5 km branch here [1][5]. The returning wave adds to the main's own transient. In our case the closed branch, carrying no flow at all, takes the main from +4.33 to +1.26 m and its own far end to vapour. Fire mains, washout and future-connection stubs, and valves normally closed between zones are all closed branches during a transient.

4 · What can be removed, and what cannot

Skeletonising a network for a transient model: our rules
DetailKeep or removeWhy
Large offtakes and branches to tanksKeep as pipesThey reflect, feed back and change the result (section 2)
Closed branches, dead ends, normally closed valvesKeepThey double and return the wave (section 3)
Small distributed demandsLump into pressure-dependent demands at nearby nodesFixed demands overstate the downsurge
Short pipes and fittings in seriesMerge, keeping travel timeThey force a small time step (see time step)
Loops in a distribution networkKeep the main loopsA loop splits and recombines waves; a tree model can miss or exaggerate peaks
Devices, high points and changes of sectionAlways keepThey are where the answer is read

The test of any simplification is to run the governing scenario on the detailed and the skeletonised model and compare the envelopes at the critical points [2][6]. A skeleton that changes the minimum by more than the margin describes a different system.

The five models against the criterion
Lowest pressure head on the main, and at the dead end where there is one, for each way of modelling the network.
Check it against the project's allowable values.
Models that pass on the main
–
Spread between models
–

The spread between the five models (4.3 m on the main) is larger than the margin of the base design (1.3 m). The modelling choice decides the verdict.

5 · Setting it up in Bentley HAMMER

Field names differ slightly between versions [7].

  1. Start from the steady-state model and decide, branch by branch, what the transient model must keep, using the table in section 4.
  2. Use Skelebrator for series pipes and small branches, but lock the elements that must stay: offtakes to tanks, closed branches, devices, high points.
  3. Choose the demand representation for the transient: check how your version treats junction demands during a transient run, and use a pressure-dependent form (an emitter or orifice) for offtakes that really respond to pressure. Model large offtakes as pipes to their tanks.
  4. Keep normally closed valves as closed valves, so the branches behind them are dead ends in the transient.
  5. Run the governing scenario on both models, the detailed and the skeleton, and compare the envelopes at the critical points before using the skeleton for the protection design.
  6. Bracket the demand model: run fixed and pressure-dependent demands and report both if the verdict depends on it.

6 · Checklist

Surge analysis practice series
  1. Is your HAMMER run right? Time step, adjustment and run duration
  2. Validating a surge model with a field pump-trip test
  3. Sensitivity and uncertainty: bounding the result
  4. Pump data for a pump trip: inertia, specific speed and four-quadrant curves
  5. Demands, branches and dead ends in a transient model
  6. Reading the surge envelope against the pipe's real limits
  7. Transient forces on pipe supports and bends
  8. Booster stations in series
  9. Pump starts, controlled stops and drive ramps
  10. Filling, draining and restarting a transmission main
  11. Surge in wastewater force mains
  12. The surge study report: what to deliver and what a reviewer checks
The protection devices themselves are covered in the surge protection design series.

References & standards

  1. Wylie, E.B. & Streeter, V.L. Fluid Transients in Systems. Prentice Hall, 1993: junctions, branches, dead ends and wave reflection in networks.
  2. Boulos, P.F., Karney, B.W., Wood, D.J. & Lingireddy, S. “Hydraulic transient guidelines for protecting water distribution systems.” Journal AWWA, 97(5), 2005: transients in distribution networks, demands and skeletonisation.
  3. Abokhatwa, M. Surge protection design series, abokhatwa.com, 2026: the reference main, its vessel and the verified MOC solver.
  4. Karney, B.W. & McInnis, D. “Transient analysis of water distribution systems.” Journal AWWA, 82(7), 1990: demand representation and the behaviour of networks under transients.
  5. Chaudhry, M.H. Applied Hydraulic Transients, 3rd ed. Springer, 2014: branching pipes and closed branches.
  6. Jung, B.S., Boulos, P.F. & Wood, D.J. “Effect of pipeline network skeletonization on hydraulic transient simulation.” Journal of Water Resources Planning and Management, 135(4), 2009: when skeletonisation changes transient results.
  7. Bentley Systems. OpenFlows HAMMER documentation: Skelebrator, junction demands, emitters, valves and transient calculation options.
#SurgeAnalysis #WaterHammer #NetworkModelling #Skeletonization #DemandModelling #PressureDependentDemand #DeadEnd #ClosedBranch #DistributionNetwork #SurgeVessel #BentleyHAMMER #Skelebrator #TransientAnalysis #WaterEngineering