From first principles to real design — Mechanical, Electrical & Plumbing systems for tall and super-tall (megatall) mixed-use buildings. Concept first, then component-by-component design, with interactive graphs, original schematics, worked numeric examples, and every key figure tied to a code or standard.
This is a detailed design reference, not an overview. After the fundamentals, each discipline module follows the system from its source to the last component in the room — and every component gets the same treatment:
RoleDesign method & formulaWorked numeric exampleIn the software (how to get accurate results)Code reference
The modules follow a mechanical-first path — Fundamentals → HVAC → Plumbing → Fire, then Electrical, ELV/BMS and Vertical Transport — but each module is self-contained, so you can jump straight to any discipline. Each is tied to its standard engineering software (HVAC → Carrier HAP, Revit, AFT Fathom, CONTAM; others use their own industry tools).
Units & quantities, the three governing physics, the master concept of vertical pressure zoning, plant floors, stack effect, and the codes that govern everything.
The full chain: chiller plant → heat rejection → pumps → vertical CHW zoning → AHU → ducts → VAV → FCU → room diffuser → controls → smoke control. 17 components, each with design steps, numeric example & software how-to (HAP, Revit, AFT, CONTAM).
Mains & storage → transfer pumps → pressure zoning → boosters → pipe sizing → hot water & Legionella → valves & surge → drainage/vent stacks → storm → fixtures → reuse → installation. 14 components, each with design, numbers & software (AFT, Revit, manufacturer tools).
Fire strategy → fire-water storage → fire pumps (NFPA 20 curve) → riser zoning/PRVs → standpipes → sprinklers (density/area) → special hazards → valves/FDC → installation → Civil Defense commissioning.
Load estimate → HV intake → transformers → LV switchgear & fault → risers/busways → cable sizing & volt-drop → boards → generators/UPS → lighting → earthing/lightning → installation. Tools: ETAP, DIALux.
Detection & voice evacuation, FA battery sizing, BMS/BACnet, structured cabling, CCTV/access/security, in-building coverage, and the integration & cause-and-effect that ties it all together.
Traffic analysis (handling capacity & interval) → arrangement/zoning & sky lobbies → lift types & ropes → machine/shaft → firefighting lifts → escalators → dispatch control → power. Tool: Elevate.
Get expert articles on MEP and water infrastructure — HVAC, fire, electrical, plumbing and vertical transport — delivered to your inbox.